• Clear sky
  • 64°
    Clear sky

sponsored by Edina Realty

  • Comment

Highway 23 opens as four lanes between St. Cloud and Foley

Detour lifted as construction winds down

Posted: November 2, 2012 - 8:14pm

Hunters and other motorists traveling for the opening weekend of Minnesota’s firearms deer season will find four new lanes of roadway open on Highway 23 between St. Cloud and Foley.

The road was scheduled to be open by 6 p.m. Friday, Nov. 2.

Highway 23 between Highway 95 near St. Cloud and Highway 25 in Foley was closed March 19 as crews completed a project that converted eight miles of the busy roadway to a four-lane divided highway.

The redesigned highway also includes new turn lanes, programmable signal system with flashing yellow arrows at the Highway 23/25 intersection, improved drainage system, improved local roads and utilities and upgraded pedestrian crosswalks that meet modern accessibility standards.

Traffic engineers will next monitor the roadway’s operations, optimize the signal timing at the Hwy 23/25 intersection and conduct a speed study.

More information can be found on the project’s website at www.dot.state.mn.us/d3/hwy23/index.html.

  • Comment

Spotted

Please Note: You may have disabled JavaScript and/or CSS. Although this news content will be accessible, certain functionality is unavailable.

Skip to News

« back

next »

  • title http://spotted.brainerddispatch.com/galleries/543863/ http://spotted.brainerddispatch.com/galleries/543858/ http://spotted.brainerddispatch.com/galleries/543848/
  • title http://spotted.brainerddispatch.com/galleries/543843/ http://spotted.brainerddispatch.com/galleries/543838/ http://spotted.brainerddispatch.com/galleries/543833/
  • title
Montessori Kindergarten Graduation

CONTACT US

  • Switchboard 218-829-4705
  • Report News 218-855-5860
  • Advertising 218-855-5835
  • Classifieds 218-855-5898
  • Circulation 218-855-5897
  • View the Staff Directory
  • or Send feedback

ADVERTISING

SUBSCRIBER SERVICES

SOCIAL NETWORKING